+86 0371 8654 9132

screening of excavated material scope of work

SCOPE OF WORK EXCAVATION EMERALD HEIGHTS 1.1

SCOPE OF WORK EXCAVATION EMERALD HEIGHTS 1.1 GENERAL A. WORK The term “Work” includes all labor, materials, equipment and services required of the CONTRACTOR, as shown, described or inferred in the Contract Documents. The CONTRACTOR is only to use its own forces and/or OWNER/CONSTRUCTION MANAGER approved sub-trades to undertake the

Read More
SCOPE OF WORK EXCAVATION SHORING ALDER STREET

SCOPE OF WORK EXCAVATION SHORING ALDER STREET PROJECT 1.1 GENERAL A. WORK The term “Work” includes all labor, materials, equipment and services required of the CONTRACTOR, as shown, described or inferred in the Contract Documents.

Read More
CHAPTER 2 EARTHWORK 2.1 SCOPE: 2.2 GENERAL

2.1 SCOPE: Earthwork shall consist of all necessary site clearing and grubbing, excavation and backfill for structures and trenches, site grading, grassing and restoration, as well as related work as shown on the plans and as specified herein. 2.2 GENERAL:

Read More
DIVISION 2 - 02200 Excavation, Grading, and Backfill

Provide all related materials, equipment, and labor required to complete the work specified. All excavation, trenching, compaction, backfill, and landscaping shall be as listed in the Scope and as specified herein. 1.2 QUALITY OF WORK Provide experienced, well-trained workers competent to complete the work as specified.

Read More
WORK PLAN – EXCAVATION OF SOIL WITHIN TAYLOR WAY

7. Scope of Work The following is a generalized description of the proposed scope of work to be completed. The actual scope of work to be performed will be fluid since findings will occur thr oughout the work which may cause adjustments to be made. 7.1.Pre Excavation Work: The following work will be completed prior to the start of the excavation:

Read More
Scope Of Work Crushing And Screening Equipment

Scope of work crushing and screening equipment scope of work crushing and screening equipment. scope of work crushing and screening equipment. 10 discount low consumption stone crushing machine cone crusher. Stone crushing machine cone crusher Working Principle. Cone Crusher is one of the main types of primary crushers in a mine or ore.

Read More
SCOPE OF SERVICES

One discrete soil sample from the base and from each sidewall of the excavation. 2. If field screening results indicate that residual petroleum contamination is present in surface soil ... • Contractor will backfill the excavation with suitable clean fill material. For budgeting purposes, estimate ... scope of work to be carried out. Should ...

Read More
SCOPE OF WORK EXCAVATION SHORING ALDER

SCOPE OF WORK EXCAVATION SHORING ALDER STREET PROJECT 1.1 GENERAL A. WORK The term “Work” includes all labor, materials, equipment and services required of the CONTRACTOR, as shown, described or inferred in the Contract Documents.

Read More
Construction Specification 421 – Excavation

Scope. The work shall consist of the excavation required by the drawings and specifications and disposal of the excavated materials. 2. Classification. Excavation is classified as common excavation, rock excavation, or unclassified excavation in accordance with the following definitions. Common excavation

Read More
CHAPTER 2 EARTHWORK 2.1 SCOPE: 2.2 GENERAL

2.1 SCOPE: Earthwork shall consist of all necessary site clearing and grubbing, excavation and backfill for structures and trenches, site grading, grassing and restoration, as well as related work as shown on the plans and as specified herein. 2.2 GENERAL:

Read More
WORK PLAN – EXCAVATION OF SOIL WITHIN TAYLOR WAY

7. Scope of Work The following is a generalized description of the proposed scope of work to be completed. The actual scope of work to be performed will be fluid since findings will occur thr oughout the work which may cause adjustments to be made. 7.1.Pre Excavation Work: The following work will be completed prior to the start of the excavation:

Read More
SECTION 2 EARTHWORKS - UNDP

2.1 Scope of Work This section covers trenching and backfilling work and shall include the necessary clearing, grubbing and preparation of the site; removal and disposal of all debris; excavation and trenching as required; the handling, storage, transportation and disposal of all excavated material; all

Read More
Excavation Work Plan (EXC-WP)

Dec 02, 2014  2.3.2 Excavated, Saturated Fill Material Stockpiles If saturated fill material is excavated as part of the Work, a stockpile staging area will be constructed. The proposed stockpile staging area for excavated fill materials will be constructed so that it is large enough to accommodate anticipated stockpiles as well as stabilization reagent,

Read More
Excavation and Backfilling of Soil - Work Sequence and ...

Scope of Work for Excavation and Backfilling of Soil. Setting out of corner benchmarks. Survey for ground levels. Survey for top levels. Excavation to approved depth. Dressing of loose soil. Making up to cut off level. Constructing dewatering wells and interconnecting trenches. Marking boundaries of

Read More
STANDARD CONSTRUCTION SPECIFICATIONS FOR

Article 1.1 Scope of Work The Work covered by this Division consists of providing all plant, labor, equipment, supplies, material, transportation, handling, and storage, and performing all operations pertaining to the: 1) construction of subbase for parking lots, streets, alleys, curbs, gutters,

Read More
Excavation in Construction from Construction Knowledge.net

Earth excavation and grading can be a fascinating part of a construction project. The powerful heavy equipment, used to best advantage by a skilled operator, is a joy to behold. The scope of the excavation job varies from digging footings for a small building to moving millions of cubic yards of earth.

Read More
PART 1 – GENERAL

K. Excavation, handling, sampling, transport and disposal of potentially lead contaminated soil will be subject to the requirements of Section 026100 – Excavated Soil and Material Management Plan. L. The Contractor will clean all work areas of any visible debris at the end of each workday

Read More
SCOPE OF WORK Construction Services to Build/ Provide

SCOPE OF WORK FOR RENOVATION TO POOL March 15, 2019 2/12 SENSITIVE BUT UNCLASSIFIED C-SCOPE OF WORK AND GENERAL SPECIFICATIONS: - Contractor shall provide needed materials, equipment, tools, and labor for building two wooden Traditional pavilions with measurements of about 35 feet around.

Read More
SCOPE OF SERVICES FOR SURVEYING SERVICES I.

II. SCOPE OF WORK Consultants will perform engineering and related services for CPRA projects on an as needed, Task Order basis. Consultants will be required to execute a Task Order which will specify the scope of services, task schedule, and compensation. Each Task Order will become a part of the

Read More
Section 00405 - Trench Excavation, Bedding, and Backfill

Section 00405 - Trench Excavation, Bedding, and Backfill Description 00405.00 Scope - This Work consists of excavating trenches, constructing trench foundations, and placing bedding, pipe zone material and backfill. 00405.01 General - Excavate, backfill and dispose of excess excavated materials in connection with

Read More
Scope of Work and Schedule, Cleanup Action Plan

The Scope of Work as described below must be accomplished in accordance with the ... Once overburden soils are excavated to the top of waste, all material below the top of waste will be considered contaminated unless demonstrated ... procedures for excavation, inspection, physical screening, relocation of stormwater controls, dust and odor ...

Read More
SCOPE OF WORK Soil Testing Protocol and Environmental ...

Screen the work zones and suspect material for the presence of creosote related VOCs. Observe daily operations for compliance with the approved Health and Safety Plan. Assist in screening stockpiled soil and determination of disposal/backfill requirements. If contaminated soil or groundwater is observed, the firm will notify the contractor or

Read More
SCOPE OF WORK - Alaska

Aug 31, 2005  The final size of the excavation was approximately 15 by 15 feet and 7 feet deep. Following sample collection, the excavation was backfilled with material previously stockpiled on-site. TLC General, Inc., took possession of the tank for disposal; a letter of disposition is attached. Tank #5 Excavation began at Tank #5 on the north side of the UST.

Read More
1. Introduction 2. Site History and Background

Feb 27, 2018  3. Completed Scope of Work The proposed scope of work presented in the Work Plan consisted of the following: • Installation of two test pits and one excavation to investigate the potential UST • Collection of soil samples if field screening (i.e., elevated PID readings, observed staining or tar)

Read More
SCOPE OF SERVICES FOR SURVEYING SERVICES I.

II. SCOPE OF WORK Consultants will perform engineering and related services for CPRA projects on an as needed, Task Order basis. Consultants will be required to execute a Task Order which will specify the scope of services, task schedule, and compensation. Each Task Order will become a part of the

Read More
Scope of Work Specifications - HW Construction Company ...

Aug 02, 2016  A. Work of this Section shall include but not be limited to clearing, grubbing, and disposal of woody vegetation from the building site, parking area, and the storm water management site. SECTION 02200 – EARTHWORK A. Work of this Section shall include but not be limited to excavation, control fill, aggregate materials, grading, and compaction.

Read More
PART 1 – GENERAL

K. Excavation, handling, sampling, transport and disposal of potentially lead contaminated soil will be subject to the requirements of Section 026100 – Excavated Soil and Material Management Plan. L. The Contractor will clean all work areas of any visible debris at the end of each workday

Read More
Contaminated Soil Excavations, Planning and Managing to ...

already paid for a Preliminary Assessment, a Site Screening Investigation, a Remedial Investigation, a Risk Assessment, a Feasibility Study, and a Record of Decision. At this point management probably believes the site simply needs an excavation contractor to complete the work.

Read More
Guidelines for Phase I, II, and III Archaeological ...

Wet-screening, however, is less destructive to botanical and faunal materials. The technique chosen also depends upon soil types and conditions. All excavated soils should be screened through 1/4-inch mesh hardware cloth, although1/8-inch and 1/16-inch mesh hardware cloth is also acceptable if smaller artifacts or ecofacts are expected to be ...

Read More
Method Statement for Excavation Works

Jan 22, 2014  5.3 Backfilling work. 5.3.1 After completion of the compaction under blinding, tie beams and ground slab. Backfilling shall commence using similar excavated material. Care shall be taken to remove bolder, vegetations and any other deleterious materials. 5.3.2 But prior to backfilling, the compacted surface shall be accepted by the Engineer.

Read More
TECHNICAL SPECIFICATIONS FOR SEWERAGE SYSTEMS

Technical Specifications for Sewerage Systems 5 2.4 Excavation a) The Contractor shall perform all excavation true to lines, widths and depths shown on the Drawings or to such further lines, depths or dimensions as may be directed by the Engineer. b) Excavation work will be classified according to the quality of the material to be excavated. In three classes as

Read More
SCOPE OF WORK Construction Services to Build/ Provide

SCOPE OF WORK FOR RENOVATION TO POOL March 15, 2019 2/12 SENSITIVE BUT UNCLASSIFIED C-SCOPE OF WORK AND GENERAL SPECIFICATIONS: - Contractor shall provide needed materials, equipment, tools, and labor for building two wooden Traditional pavilions with measurements of about 35 feet around.

Read More
LIMITED PHASE II ENVIRONMENTAL SITE August 24, 2020 ...

3.0 SCOPE OF WORK DK Environmental excavated test pits with a backhoe and screen soils with an x-ray ed fluorescence (XRF) unit for real-time readings of the lead and arsenic concentrations. Soils in the test pits were screened from the ground surface to a depth where native soil was observed

Read More
TC - SECTION 3: SCOPE OF WORK - SHA MediaWiki

Aug 10, 2018  In the event these materials are processed through a crushing, screening, washing, or sorting plant for use as another pay item, the Contractor will be paid both for the excavation of such materials at the Contract unit price and at the Contract unit price for which the material is used.

Read More